Skip to main content
NDT Pilot

Scheduling and Assigning Work

Assign the right certified technician and set the date the job happens.

Intended for: CoordinatorsOperations GuidesLast updated 2026-09-18

Required permissions: Update requests within your organization's tenant.

Assignment turns an approved request into a dated job package the technician sees in their portal.

Before you begin

  • The request is Approved
  • Check the personnel register for a technician qualified in the request's method
  • Check the equipment register for instrument calibration status

Step-by-step instructions

  1. 1

    Check readiness

    On the Technicians page confirm the technician's certification level and methods; on the Equipment page confirm calibration is current for the instruments you will send.

  2. 2

    Assign the technician

    On the request, choose the technician from the Assign dropdown.

  3. 3

    Set the scheduled date

    Record when the work happens, the technician sees this date in their portal.

  4. 4

    Advance the status

    The request becomes Scheduled; when the crew mobilizes, mark it In Progress.

Expected result

A dated, assigned job package visible to the technician.

What happens next

The technician reviews the package and completes the field report.

Fields explained

Assigned technician
Who performs the work, visible with their qualification record.
Scheduled date
The planned date of the inspection.

Statuses explained

Scheduled
Assigned and dated, awaiting the work day.

Important

  • The platform does not block assignment of a technician whose qualification does not match the method, the register makes qualifications visible, and verifying suitability remains your responsibility.

Troubleshooting

No technician available for the method

Record the request and leave it approved; assign when availability changes, and note the delay to the customer.

Related questions

Was this guide helpful?

Contact support